POOL OPENING
Get ready to get your swim on! We can handle your pool opening from the beginning until you’re swimming.

Pool opening takes place from early to late spring. The process takes about 3-5 business days for your pool to be swim ready, depending on the condition and size of your pool. Here are the steps we take to ensure your pool is opened safely:
- To start off, we drain the waste water from surface of the pool cover
- Removal of leaves and organic waste from the cover surface (stored in paper waste bags and placed for garbage removal)
- Additionally, we will remove your cover, and fold it ready for storage
- Assembly of all filtration, sanitation and heating equipment are also included
- Removal of debris from inside of pool
- Treatment of water with appropriate chemicals
- Skimming and 30 mins of vacuuming of the swimming pool
*Additional cleanings may be required depending on the condition of your pool. Additional visits can be scheduled on the day of the opening.
*Balancing chemicals are charged separately, if needed*
Send us a message to schedule your pool opening!
